Welcome to the ATCO Group of Companies ATCO Group
  

Metal Building - Fort McKay First Nation Hockey Arena


Project Snapshot

Date: 2011

Location:
Fort McKay, Alberta, Canada

Client:
Fort McKay First Nation

Category:
Metal Building

Market Segment:
Government

ATCO Structures & Logistics was selected by the Fort McKay First Nation to design, supply and install a pre-engineered year round hockey arena. The building includes:

  • ATCO proprietary wall and roof assemblies
  • Two (2) roll-up doors
  • Engineered heating and ventilation systems
  • Engineered electrical system
  • Site grading and leveling
  • Built-in masonry wall change rooms
  • Refrigeration ice plant to create the skating surface year-round
ATCO Structures & Logistics also provided and installed the hockey arena’s glass vestibule, concession, score board and sound system.
Project Challenges:
The primary challenge on this project was weather. Due to the project’s location and construction continuing through winter, ASL had to combat blowing snow and temperatures dropping to -55C.

The arena being constructed


Interior view of the arena